Used Machinery

Share us

40 - 120 Gallon 10 Bar Air Compressor Receiver Tank With Double Sided Welding

SJ-300-85

Description

1. The Role of air compressor receiver tank?

?

- - - -
1 | Storage of air and energy |
2 | Reduce the pressure pulsation of compressor exhaust continuously ,to achieve the balance |
3 | Reduce the temperature of the compressed reducing filter and desiccant load. |
4 | Reduce filter and desiccant load |
- - - -

?

?

2. Product advantages

?

- - - -
1. Design | Free design according customer& acute;s requirement |
2. Finished | With in house Blast Cleaning and Paint Spray facilities, Internal and External finishes to specific BS/EN/ISO standards are common practice. Galvanization, Epoxy Resin, DWI approved paint, and other finishes at your request. |
3. Testing | Materials, Processes, and Final Products are tested in a variety of ways, including: X-Ray, Tensile Tests, Hardness Tests, Dye Penetration, Hydrostatic, Radiographic etc. |
4. Document | Full Certification can be supplied: – Certificates of Conformity, Hydraulic tests, weld procedures, weld tests, material certificates, pressure gauges, relief valves etc. upon your request. |
- - - -

?

3. Function

?

1. Energy storage (for emergency needs)

2. Stable pressure

3. Ease pulse impact on gas equipment

4. To precipitate water, grease & dust in the air

5. Improve the continuity and stability of the equipment for the gas output

6. Reduce the frequent start of the compressor, extend its life

?

4. Our Advantages

?

- - - -
1 | Double-sided welding for all the connecting pipes |
2 | All the connecting pipes are sealed by plastic parts |
3 | Section design for the air inlet |
4 | Sewage valve with elbow design |
5 | Longitudinal seam, ring seam welding, double - sided submerged arc welding |
6 | Surface treatment: sandblasting , primer (2 times), finish |
- - - -

?

5. Our production process

?

1. Lofting, marking-off & cutting.

2. Manufacturing & welding

a. Make holes

b. Crimping plate

c. Spheronization

d. Welding

e. Install

f. Circumferential welding

3. Surface treatment

a. For Carbon Steel (1)Sand blasting (2)Primer (for 2 times) (3)Finishing coat

b. For Stainless steel (1)Sand blasting OR (2) Polishing

?

cheap prodocuts, china suppliers,

Read More

Previous

1000L 8 Bar Vertical Air Compressor Receiver Tank Pressure Pulsation Reduction...

Previous

Carbon Steel Natural Gas Storage Tank With Section Design 5000L 145psi Pressure...

Shanghai Fengxian Equipment Vessel Factory

Air Compressor Receiver Tank,Vertical Air Receiver Tank,Horizontal Air Receiver Tanks

Address: No.2108 Huhang Road Nanqiao Town Fengxian distric Shanghai,
Shanghai, Shanghai
China, 200000

Tel: 86-21-67192016
Fax: 86-21-37110818

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多