Batteries & Chargers
Description
400kva?3-Phase?Pole?Mounted?Oil?Immersed?Transformer?Electrical?11kv
?
?
Oil Transformer?
?
1. 10kv 20kv 35kv
2. IEC60076, ISO9001, CE?
3. 5-year guarantee?
4. Good sealing?
5. Easy installation
?
Technical?parameter:?
?
- - - -
Item?NO. | Group?Voltage?&?Tap?Range | Connection
Symbol | No-load
power(W) | Load
Loss(W) |
High
Voltage
(KV) | Tapping
Variation | Low
Voltage(V) |
S11-M-30/10 | 6
6.3
10
10.5
11 | ±5%
±2*2.5% | 0.4 | Dyn11
Yyn0 | 100 | 600 |
S11-M-50/10 | 130 | 870 |
S11-M-63/10 | 150 | 1040 |
S11-M-80/10 | 180 | 1250 |
S11-M-100/10 | 200 | 1500 |
S11-M-125/10 | 240 | 1800 |
S11-M-160/10 | 280 | 2200 |
S11-M-200/10 | 340 | 2600 |
S11-M-250/10 | 400 | 3050 |
S11-M-315/10 | 480 | 3650 |
S11-M-400/10 | 570 | 4300 |
S11-M-500/10 | 680 | 5150 |
S11-M-630/10 | 810 | 6200 |
S11-M-800/10 | 980 | 7500 |
S11-M-1000/10 | 1150 | 10300 |
S11-M-1250/10 | 1360 | 12000 |
S11-M-1600/10 | 1640 | 14500 |
S11-M-2000/10 | 2150 | 18500 |
S11-M-2500/10 | 2550 | 21500
? |
- - - -
?
?
Product features:
????? 1, using the corrugated tank sealing structure, enclosure, to prevent contact with air, water in contact with the transformer, reducing the degree of aging of the oil, to extend the service life of the transformer; Through the elastic deformation of corrugated to adjust the volume change of transformer oil heat bilges cold shrink.
?????? 2, the product structure for the outdoor type, oil-free pillow,anti-fouling high level;; in normal use period without replacement transformer oil, truly maintenance-free, to ensure safe operation and reliability of the grid.
? ? ? ?3, the transformer has a pressure release safety devices, when a transformer failure pressure is too high, it can be safely released reliably through the pressure relief valve to prevent the expansion of the accident.
?
?
? ?PS:?the?weight?and?dimension?just?for?reference,?please?in?kind?prevail.
?
??Measurement of winding resistance
? Ratio test
? Vector group
? Separate source voltage withstand test
? Induced over-voltage
? Insulation resistance
? Oil leakage test on fully assembled transformer for 12 hours
? Measurement of impedance voltage
? Magnetic balance
? Measurement of no-load loss and current
? Measurement of load loss (at normal & extreme taps)
? Tests on on-load tap-changer
? Tests on on-load tap-changer remote control panel
? Efficiency at 50%, 75%, 100% loading at unity p.f and rated terminal voltage (Corrected to 75C)
? Lightning impulse withstand test
?
Type Tests to IEC 60076 (to be done during acceptance testing at factory)
?
? Temperature rise test – To be performed on one unit during acceptance testing.
Lightning Impulse Withstand Test is already listed under Routine Tests as per IEC 60076.
??
?
Read More
FoshanNoahElectricalCo.,Ltd.
Oil Immersed Transformer,Dry Type Power Transformer,Amorphous Alloy Transformer
Address: No.91, North Fenjiang Road, Chancheng District,
Foshan, Guangdong
China, 528000
Tel: 86-757-82805066
Fax: 86-757-8280127