Building Supplies

Share us

HD200 Mabey Temporary Steel Truss Bridge High Strength Bailey Bridge

CB100 321

Description

HD200 Mabey Temporary Steel Truss Bridge High Strength Bailey Bridge

?

?

Ease of Assembly and Installation

?

Most Bailey bridges are assembled and installed in a matter of days by a small crew. Common hand tools are utilized. All connections are pinned, bolted or clamped. No welding is necessary. Disassembly is similarly easy, and components can be stored in minimal space until reused. Bailey bridges are often installed by the cantilever launching method, in which the assembled bridge together with a “launching nose” is rolled out across the gap, without falsework or heavy equipment. The cantilever method allows bridges to be quickly erected over rivers or deep gorges. Additionally, some Bailey bridges may be hoisted into place by crane.

?

?

?

Variable Configuration


Bailey bridge components can be assembled in seven different configurations to efficiently accommodate a wide range of span and capacity requirements. Panels, the primary Bailey components, are pinned together at the job site to make girders of any length. Various girder strengths are achieved by assembling either a single row of panels, or two or three rows side-by-side. Panels may also be stacked in double-story height for further increase strength. For greatest strength, longer spans may be chord-reinforced.

?

?

Spans


For highway use, typical Bailey bridge clear spans range from 20 ft to 200 ft. Multiple-span bridges of any length are possible by incorporating intermediate supporting piers.

The Bailey Bridge is a safe, proven answer to diverting or detouring traffic for construction. A perfect solution, a temporary Bailey Bridge detour for the contractor:

?

1. Speed construction – pre-engineered stocked components
2. Safety – time-tested performance
3. Modular – fast installation and removal
4. Versatility – 10’ multiple bays use the same parts
5. Cost effective to own and re-use in different length bridges
6. Damaged parts can be easily and quickly replaced from stock
?
?

?

cheap prodocuts, china suppliers,

Read More

Previous

Compact Portable Steel Bridge Q345B Steel Easy Assemble Wire Suspension Bridge...

Previous

Hot Dip Galvanized Deck Truss Bridge , Lower Cost Temporary Steel Bridge...

Jiangsu Sujian Road & Bridge Machine Co., Ltd.

Modular Steel Bridges,Steel Truss Bridge,Steel Suspension Bridge

Address: zhenjiang, jiangsu province XinFeng industrial park.,
Zhenjiang, Jiangsu
China, 212000

Tel: 86-511-83328099
Fax: 86-511-83328099

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多