Building Materials

Share us

Waterproof Recycling Self Climbing Formwork For High Buildings and Towers

ACS50

Description

Description:

Auto-climbing system ACS50 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for the high rise building and bridges.

Competitive Advantage:


1. Perfect anchor system with high load bearing capacity.


As the picture shown, the anchor system is composed of five parts. The load bearing will firstly be transferred to tensile bolt①, then be transferred to climbing cone③, tensile tie④ and anchor plate⑤, that means the concrete structure will be the final force point. Therefore, the whole ACS system unit is very safe and stable.



2. Crane-independent


Crane-independent forming, striking and climbing speeds up the work procedures on the construction site and also makes them independent of each other. This means the planned sequences can be maintained along with guaranteeing high productivity levels. The crane can therefore be used for other tasks.

3. High bearing capacity and safe


The stable working platforms are able to carry large loads, e.g. the storage of reinforcing steel for the next climbing section. Generously-sized working platforms, the well thought-out design for handling very high wind loads and the patented control function of the climbing mechanism are some of the special details contained within the comprehensive safety concept.

4. Platforms adjusted to suit the angle of inclination


The horizontal working areas thus created provide safe and comfortable conditions for reinforcement work, shuttering and striking, concreting and finishing.


5. Outstanding economical efficiency


The ACF system climbing without any lifting machine and it guarantees the simple operation procedure. Time saving, labor saving, site saving, so economical construction

self climbing formwork , anchoring system,

Read More

Previous

Cost Effective Table Formwork with Adjuatable Props for Slab...

Previous

GTF System with High Construction Efficiency for Bridge Deck Construction...

CCCC FWK INTERNATIONAL FORMWORK ORPORATION

formwork,scaffolding,construction accessories

Address: 2 floors,No 1 Building, FWK business center,Cangzhou east economic development zone,
Cangzhou, Hebei
China,

Tel: 86-317-4834998
Fax:

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多