Industrial Supplies Stocks

Share us

PLC Control Polyurethane Foaming Machine , Sponge Mattress Foam Production Line

QHF-2017

Description

PLC Control Polyurethane Foaming Machine , Sponge Mattress Foam Production Line

?

Specification


This machine is mostly used to produce large-scale continuously foaming production (density is about 6 to 100 kg/m3 ) . It adopts the advanced touch screen and PLC Operation System , its automatization level is high , the production is low-cost and the quality fo foam is outstanding .
It is the most ideal equipment for large-scale foaming produce . Man-machine interface , non-stop the machine can change formulas , it can produce the British elevation high-slow rebound , electronic cotton , brassieres cotton , polyester cotton , yellow-resistant up to 3-5 level , add powder 10 to 200 parts , the lowset density 6-100 , it also can produce on machine .

?

?

Main specification

?

- - - -
?Oven Length | 18m |
?Foam Height | 1.0-1.25m |
?Foam Width | 1.0-2.25m |
?foam desity | 8-200kg/m3 |
?total power | 130KW |
?inner coveyer length | 18m |
?side board adjustable width | 0.98-2.3m |
?conveyer belt speed | 0-8m/min |
?fall plate | seven section adjustable |
?total output | 100-300kg/min |
?machine dimension | L35× W4.2 ×H3.2m |
- - - -
? ?
Main technique specification:

?

- - - -
Dimension | Total length 35m×Total width 4m×Total Height 3m |
Foaming material Group | 13 groups, man-machine interface, both manual and automatically computer control |
Foaming width | 980mm~2250mm |
Foaming height | Max 1200mm |
Foaming density | 8Kg/m3~100kg/m3 |
Foaming speed | 2000r/min~7000r/min |
Max total output | 300kg/min |
Material spraying way | ① The way of down sprayer head (upper, down, front, back can be adjusted) ? ? ? ? ? ? ② the way of trough overflow pipe. |
Controlling way of foaming | ①PLC controlling, can continuously foaming two different formulas in one time ②All inverter controlling foaming and work in phase with the production line ③Oven declining board height and width can be adjusted by control box. ④Oven side links width can be adjusted by control box |
Mixing –head motor | 37kw |
Total power | About 90kw |
- - - -
? ?
How is the packing of the machine?

?

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

?

How many container will be needed for the whole set of machine?

?

For the standard 13 groups of?Automatic continous foam machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

?

?
Our Services
?

1. We will help to design the layout of the machine that put in your factory.

?

2. We will send 2-4 experience engineers to install and testing the machines.

?

3. We will teach your engineer how to operate the machine and how to maintain the machines.

?

4. We will give you the machine operation manual and the best formulation for target products that you are going to make.

?

5. We will help to buy the best raw material for making the foam if you needed.

?

?

FAQ:

?

Q: How many days for the install and testing of the machine?

?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

?

Q: For the cost of the engineer how much I need to pay?

?

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

?

Q:What kind of raw material tools we need to prepare for the testing?

?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

?

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

?

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

?

Q: During the using of the products if we find some problem how can we slove?

?

A: You can just help to check in the operation manual and the video first if can’t work just call our after sale service.

?

Q: How many spare parts for you to give us?

?

A: We will send you all the necessary spare parts that free of charge together with the machine. After that you need to buy.

?

?

?

The main part of the machine

?



?

?

?

cheap prodocuts, china suppliers,

Read More

Previous

Horizontal Foam Sheet Making Machine For Producing Flexible Polyurethane Foam...

Previous

Automatic Polyurethane Foam Making Machine PU Foaming Machine High Pressure...

Dongguan Qianghui Foaming Machinery Technology Co., Ltd.

Foam Making Machine,Polyurethane Foam Machine,Low Pressure Foam Machine

Address: BaoAnWei No.1 Village,Gaobu Town,
Dongguan, Guangdong
China, 511700

Tel: 86-769-81302245
Fax: 86-769-81302246

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多