Power Transmission Equipment
Continuous Automatic Low Pressure Foaming Production Line For Sofa Pillow Sponge
QFP-2017
Description
Continuous automatic Low Pressure foaming production line for Sofa pillow sponge with Siemens motor
?
1. 13 components of raw materials can control by fully-automatin, high degree of automation, control more flexible.
2 The user can store 100 different formulations, also can adjust or change the formula at any time.
3 The user can control remotely by the Internet, so that the cost of the production control is more scientific and intuitive.
4 There are two kinds of configuration options can be selected. They are manual automatic and automatic man-machine interface
?
Company Information
?
Dongguan Qianghui Machinery Co., Ltd is specialized in research and development and manufacture foam machines. Take the advance technology of some profession and improvement. Absorb the new originality strictly control the product quality full service tracking insist on manufacturing the high quality products. Our main products QHF-2017?Foam Production Line can make the foam for furniture industrial shoes industrial and so on.
?
?
Product Description
?
[Specifications]
- - - -
Dimension | L33M×W4M×H3M |
Foaming width | 980mm~2250mm |
Foaming height | Under 1200mm |
Foaming density | 8kg/m3~100kg/m3 |
Foaming speed | 2000rpm~7000rpm |
- - - -
?
(1) The whole machine parts specifications:
1. Foaming control Platform(standard) L3m×W2.52m×H0.7m
2. Oven declining board (standard) L9m×W0.98m~2.30m
3. Oven side links(standard) L18m×W2.3m×H1.2m
4. Oven machine frame(standard) L18m ×W4m×H3m
5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )
?
(2) Main technique specification
1. Total length 33m× width 4m×height 3m
2. Foaming material Group: 13 groups, man-machine interface, automatically computer control
3. Foaming width 980mm~2250mm
4. Foaming height Max 1300mm
5. Foaming density 8Kg/m3~100Kg/m3
6. Foaming speed 2000r/min~7000r/min
7. Max total output 300KG/min
?
- - - -
Motor | Guangdong brand |
Pump | Viking pump & Chinese pump |
Invertor | Siemens brand |
PLC | Siemens |
Temperature | Control system |
- - - -
?
Remark:The above only for reference. All the data is subjected to sold products.
?
?
The frame of production line
? The foam oven ? Foaming control platform ? Mixing head and material tanks ? Packing & shiping ?
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
?
How many container will be needed for the whole set of machine?
Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
?
We will try the best way to pack all the machine well and also save the freight cost.
?
?
Our Services
?
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
?
FAQ
?
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
?
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
?
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
?
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
?
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
?
?
You are warmly welcome come and visit our factory.
Read More
Dongguan Qianghui Foaming Machinery Technology Co., Ltd.
Foam Making Machine,Polyurethane Foam Machine,Low Pressure Foam Machine
Address: BaoAnWei No.1 Village,Gaobu Town,
Dongguan, Guangdong
China, 511700
Tel: 86-769-81302245
Fax: 86-769-81302246