Assembly Line & Production Line

Share us

Red Copper Billet Vertical Continuous Casting Machine Single Strand

GVT

Description

?

Red Copper Billet Vertical Continuous Casting Machine Single Strand ?

?

?

Ⅰ. Specifications:

1. Types of casting specifications

* ?Red copper

?

1.1 Hollow billets (tube-shaped)

a. Thickness range * width range ( 80-- 300)*(420-- 1200) mm 1.2 Hollow billets (tube-shaped)

b. Length To be decided according to customers& acute; requirements

c. Number of production lines To be decided according to sections and output

?

1.2 Round-shaped billets

a. Diameter range Φ( 80-- 350) mm

b. Length To be decided according to customers& acute; requirements

c. Number of production lines To be decided according to sections and output

To be decided according to customers& acute; requirements in near-the-net-shape sections

?

Ⅱ.Program example

1. Billet specification

? ?Single strand:Φ355×5500mm(before cutting)

? ?Double strand:Φ250×5500mm(before cutting)

2. Effective casting weight:≥5t

3. Melting furnace area (including furnace): 5000 * 7000mm
4. Platform height: 2500mm
5. The lead casting machine covers?area:4000 * 2500mm
6. Casting guide wells width: 2500 x 2500 x depth 6000mm
7. Furnace?cooling?water: 15m3 /h
8. Mould cooling water: 12m3 /h

?

Ⅲ. Composition of equipment:

? ? Melting furnace, mould device trolley and mould, wire rod semi continuous guide casting machine (hereinafter referred to as the guide casting machine), water cooling system, hydraulic system, electric control system, special tooling.

1.1 Melting furnace

? ? The melting furnace is the first core equipment in the production line,it has a large capacity, high power requirements.the following characteristics of the?furnace.

1.1.1. ?Vertical barrel shaped furnace body, with a simple masonry furnace, feeding, covering, cleaning and other operations.?The advantages of convenient construction materials, small occupation area, low surface heat radiation and low power consumption, etc.

1.1.2. ?Using the & quot;W& quot; type of jet melting groove, reduce the melt temperature difference;
3 the use of a water cooling channel can be unloaded sensor, enhance the component compatibility

1.1.3. ?Using?of a water cooling channel can be unloaded sensor, enhance the component compatibility;

1.1.4 ??Tilting furnace and furnace cover are operated by hydraulic pressure, operating balance and reliable structure;

1.1.5 ? ?Rectangular mouth, for 1100 x 900mm cathode copper raw material can not cut
Cut, whole feeding;

1.1.6 ? ? Furnace refractory materials used brand manufacturers to supply high performance induction furnace.

1.1.7 ?Technical parameters?
1.2.1 Rated capacity: 2.5t

1.2.2 Maximum capacity: 3.5t
1.2.3 Rated power: 600kW

1.2.4 Rated voltage: 600V
1.2.5?Melting rate: 2.2t/h

1.2.6?Power consumption: less than 280kwh/t
1.2.7?Working temperature: 1250

1.2.8 Cooling water comsumption:4~5m3/h

?

1.2??Lead casting machine

1.2.1 Technical parameters :
1.2.1.1 ? ?Maximum bearing capacity of more than or equal to 10t

1.2.1.2 ? ?Effective bearing capacity: >6t
1.2.1.3 ? ?Length of screw rod: 7800mm

1.2.1.4 ? ?Screw diameter: Tr220 * 18mm
1.2.1.5 ? ?Rod length: 7500mm

1.2.1.6 ? ?Rod diameter: diameter 315mm
1.2.1.7 ? ?Maximum working stroke: 6500mm
1.2.1.8 ? ?Drive motor: AC synchronous servo motor,

1.2.1.9 ? ?Drive motor power: 7.5KW.
1.2.1.10 ?Lead casting speed: 0 ~ 320mm/min,

1.2.1.11 ?Stepless adjustable
1.2.1.12 ?Fast return speed: more than 500mm/min
1.2.1.13 ?Silk lubrication: Nominal flow 50mL/min,

1.2.1.14 ?Nominal pressure 20MPa

?

1.3 ?Mould trolley
? ? The crystallizer car for crystal fixed device, it can lateral movement for loading and unloading mould, guide and cast the head and the lifting of the ingot, mould trolley has positioning and locking device, to so that the car can firmly in the lead cast position by car to replace the relief panel, can adapt to different specifications and flow number of crystallizer. Configuration of frequency conversion vibration motor drive device, its power is 2.2kW, the vibration frequency is 0 ~ 160 times /min, the amplitude is 0 ~ 12mm.

?

1.4 ?Mould
? ? The inner wall of the crystallizer materials for copper (also by party a production resources, zirconium and copper), graphite impregnated set is in favor of improving the surface quality. In addition to conventional methods, the principle of continuous casting of steel can be drawn from the use of a narrow slit type high water speed cooling mold to facilitate the effective avoidance of partial boiling of cooling water.
? ? Technical parameter:
Cooling water pressure: 0.05 ~ 0.15MPa ? cooling water comsumption: 80 ~ 100m3/h

?

1.5 Protective atmosphere cover
? ? The protective atmosphere cover can be through the gas protective agent (industrial gas) to protect the liquid level inside the crystallizer, reduce the defects of oxide slag.

?

1.6 Water cooling system
? ? The water cooling system is mainly used for the cooling of production line equipment, namely for the sensor shell, a coil, a water jacket, a water cooled cable, transformer, phase equilibrium reactor; it consists of a water dispenser, backwater collector and associated piping, valves and other, including return type can by pressure and two kinds of pressure for the Party of choice; has functions such as water pressure, backwater temperature display, control and alarm, interlock.
? ? Technical parameter:
1.6.1 Inlet pressure: 0.3 ~ 0.4MPa,

1.6.2 Inlet temperature: 5 ~ 45 degrees,

1.6.3 Water consumption: 18 ~ 20t/h
1.6.4 Outlet temperature: less than 55℃,

1.6.5 Allowing the temperature to rise: less than 20℃?(at the maximum inlet temperature),
1.6.6 Total hardness (CAO): less than 10mg equivalent /L,

1.6.7 Water resistance: greater than 2000 / cm.

?

1.7?Hydraulic system
? ? The hydraulic system for melting furnace lifting tilting, a furnace cover open and closed and insulation pouring furnace before and after walking, lifting and dumping, opening and closing lid, adopts hydraulic station centralized supply pressure liquid, electro-hydraulic valve control.
Basic parameters: oil tank (appearance): 1300 * 900 * 700mm (stainless steel)
Effective capacity: 600L
Rated working pressure: 16MP
Nominal flow rate: 40L/min
Oil pump motor: 15kw * 2 (one use, one standby)

?

1.8 Electronic control system
? ? Electric control system of the unit are respectively controlled melting furnace, lead casting machine, water cooling system, hydraulic system, our company provide mature and stable electrical control equipment to complete the necessary operating functions according to the requirements of the production of each link, control systems and electrical components used in all domestic and foreign well-known manufacturers of the original product, and left a certain margin capacity, to ensure that the equipment reliability and applicability. Among them:
? ? The guide casting machine servo driven by imported brands (Japan Yaskawa 7.5kW servo system) high torque digital AC servo system.

?

Ⅲ. Equipment Components List of Vertical Continuous Casting Production line for Round Billets

- - - -
No. | Equipment Name and Spec. | Unit | Quantity | Remarks |
1 | Semi continuous casting furnace | set | 1 | 600KW |
2 | 5T wire rod semi continuous casting machine | set | 1 | ? |
3 | Mould trolley | set | 1 | ? |
4 | Mould? | set | 1 | ? |
5 | Casting machine transmission system | set | 1 | ? |
6 | Casting machine power system | set | 1 | ? |
7 | Dummy bar head of mould | set | 1 | ? |
8 | Length control system | set | 1 | ? |
9 | Cooling water distributor | set | 1 | ? |
10 | Hydraulic system | set | 1 | ? |
11 | Electric-control operation system ? | et | 1 | ? |
- - - -

?

Ⅳ. Date of Delivery:

To be delivered within 80 days after the contract becomes effective.

?

Ⅴ. After-sales service

1. The main body of the equipment will have one year of free warranty, and special components shall be discussed separately;

2. During the trial-production period (within 3 months after equipment commissioning is finished), our company will dispatch a professional technician for follow-up service;

Within the warranty period, if fault occurs due to quality problem, our company will dispatch personnel to the site to solve the problem within 72 hours after receiving the notice;

After the warranty period of the equipment is expired, our company will offer effective solutions within 24 hours after receiving the notice, and will dispatch personnel for maintenance work if the user fails to solve the problem, only charging the cost expenses.

For annual overhaul of equipment, our company will dispatch professional technician to join the users in formulating the turnaround plan, free of charge;

Within the warranty period, our company can dispatch professional technician to the site to check the operation condition of equipment and provide field service.

After the warranty period of equipment expires, one return visit can be made on invitation once per half a year.

3. If our company has innovation and improvement points or constructive suggestions for similar equipments, we will inform the user in time.

?

?

Wuxi Huadong Industrial Furnace Co.,Ltd

Welcome to visit and inspect!

Contact persone: Angel Zhang

Contact phone:+86-13921168736

Email: wxzhangying@126.com

?

cheap prodocuts, china suppliers,

Read More

Previous

Continuous Bronze Casting Equipment Water Cooling For Cupronickel Rod...

Previous

Melting Holding Furnace Horizontal Continous Casting Machine For Copper Wire...

Wuxi Huadong Industrial Electrical Furnace Co.,Ltd.

Copper Continuous Casting Machine,Horizontal Continuous Casting Machine,Vertical Continuous Casting Machine

Address: Xishan district,Bashi Industrial Park,
Wuxi, Jiangsu
China, 214000

Tel: 86-510-83788308
Fax: 86-510-83786308

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多