Construction Projects

Share us

VFC Control Passenger And Material Construction Site Lift Adjustable Speed 2 Ton Load

SC200/200

Description

?

2000kg double cabin 0-63m/min speed passenger and material construction lift

?

Description?

?
# Changlong century focus on the the manufacturing of construction lift. We can provide reliable and durable lift, competitive prices and good after services.

?
# Available capacity for personnel and materials construction lift range from 1000kg to 2700kg. Single cage and double cages are both available.

?
# VFC controls system is applied in electrical control system. Variable frequecy bring a variable speed. The VFC control also can protect the elecrical component being damaged by the current.

?

?

Technical Data

?

- - - -
Item | Construction lift |
Load capacity | 2 Ton |
Max Installation height | 350m |
Lifting speed | 0-63m/min |
Cage size | 3.2*1.5*2.5m |
Motor power | 3*15kw |
Speed ratio | 1:10 |
Invertor Power | 45 kw |
Safety device | SAJ40-1.4 |
Mast section size | 0.65*0.65*1.508m |
Power Supply | 380V, 50Hz or customized |
- - - -

?

?



Performance features:

?
# ?Self erecting tool for mast section- can be installed without the tower crane

?
# Multi function operation platform, with wireless calling indicator, joysticks, overload protector, more function can be added if needed.

?
# The lading door can lading to the floor, is safer and more convenient. ?Call buttons can be fixed to each floor, convenient for calling.

?

?

Application?

?
# Changlong Century is a professional manufacturer for construction lift. Our construciton lift give reliable vertical transportation for materials and passenger. Our lift can be apllied in building construction, brige construction, chimminy, etc.

?

?

Safety features:

?
# Upper limit and lower limit switches, protecting the hoist from crashing bottom or rushing out or the top.

?
# Safety device. Speed sensitive parachute braking system. Magnetic brake motor

?
# Door interlock. Will shut down the power if the doors are not closed properly.

?
# Overload protector- Will alarm when the hoist is overloaded

?
# Emergency stop button

cheap prodocuts, china suppliers,

Read More

Previous

Building Construction 2 T Passenger And Material Hoist , VFC Variable Frequency...

Previous

2 Ton Twin Cage Man And Material Hoist , Industrial Buck Hoist Elevator...

Wuhan changlong century machinery co.,ltd

Construction Hoist,Construction Elevator,Passenger and Material Hoist

Address: Pioneer Industrial Park OF East lake eco-tourism scenic area,
Wuhan, Hubei
China, 430000

Tel: 86-27-86476786
Fax: 86-27-86476750

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多