Description

Steady , synchronous and safe Auto Self Climbing Formwork QPMX-50

?

Descrition:?

The?lifting?power?of?the?Formwork?QPMX-50?comes?from?its?hydraulic?system,?which?includes?the?oil?cylinder?

and?commutator.?Through?functioning?of?hydraulic?system,?the?steel?rail?and?bracket?can?climb?up?alternately,?

so?the?whole?formwork?system?climbs?steadily,?independent?of?a?crane.?It& acute;?s?easy?to?operate,?and?climbing?is fast?and?safe.

?

Structure?




?

The?Characteristics?


1.?One?oil?cylinder?unit?can?lift?50KN.
2.?The?QPMX-50?system?can?climb?not?only?vertically?but?also?slantwise,?and?the?forward?or?backward?inclination?

can?be?up?to?18?degrees.
3.?The?system?can?climb?up?wholly?or?separately.?The?climbing?process?is?steady,?synchronous?and?safe.
4?.The?bracket?does?not?come?back?to?the?ground?until?construction?work?is?finished,?and?spacing?for?work?is

?reduced while?the?bumping?damage?is?almost?completely?prevented,?especially?for?the?plywood.
5.The?error?of?structure?construction?is?tiny?and?easy?to?correct.
6.The?formwork?can?climb?up?by?itself?and?cleaning?work?can?be?done?in?situ.?The?number?of?crane?lifts?are?

greatly?reduced.

?

Standard?Climbing?Process?


1. Set?up?the?formwork?by?wall-through?tie-rods?and?pull-push?props,?embed?anchors?and?do?the?first?concrete?

pouring.
2.? Remove?the?formwork?after?the?first?pouring?and?fix?anchor?shoes?on?the?finished?wall,?lift?the?brackets?and?

formwork

?to?the?right?position,?match?the?formwork?and?do?the?second?pouring.
3. Lift?formwork?and?brackets?to?the?higher?floor;?fix?climbing?rail?and?hydraulic?system.
4. Match?the?formwork?to?the?right?position?and?do?the?third?pouring.
5. Strip?the?formwork?and?fix?anchor?shoes?on?the?finished?wall,?then?let?the?climbing?rails?climb.
6.?Brackets?climb?up?to?the?right?position,?then?install?suspended?platform.
7. Match?the?formwork,?do?the?concrete?pouring,?and?proceed?into?the?standard?climbing?stage.
?



- - - -
Project: | Suramadu Bridge(Indonesia) |
Client: | China Road & Bridge Corporation |
Date: | 09/2006 |
Formwork? Type: | Hydraulic Automatic Climbing Formwork |
Comments of client: | We choose Zulin, because he offer us excellent design plan and satisfy us from each aspect. We like Zulin, because his design is not only safe but also high efficiency. |
- - - -

?

cheap prodocuts, china suppliers,

Read More

Previous

Bridge Formwork - Ruwais Byass ( Abu Dhabi , UAE) , Shoring Tower...

Previous

Tianxingzhou bridge steel formwork system , Zulin formwork scaffolding engineering...

Beijing Zulin Formwork & Scaffolding Company

High Rise & Super High Rise Building Formwork,Building Formwork,Industrial Factory Warehouse Formwork

Address: Juyuan Industry Field No.20, Mapo Town,
Beijing, Beijing
China, 100000

Tel: 86-010-69407048
Fax: 86-010-69409139

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多