Precision Parts
Cold Vulcanizing Solution Conveyor Belt Glue Quick Drying Temperature Resistance
CMX3000
Description
?
?
Cold Vulcanizing Solution Conveyor Belt Glue Quick Drying Temperature Resistance?
?
?
Production Application
?
?
CMX3000 is suitable for cohesion of rubber-rubber, rubber-metal, rubber-fabric & fabric-fabric.
?
It has superb performance to be used for repair of conveyor belt, cold splicing of conveyor ends, pulley
?
lagging ect. Same with SC2000.
?
ER-45 hardener?is a kind of special rubber adhesive for splicing hardener, which can accelerate the
?
neoprene rubber, natural rubber, polyurethane adhesive splicing speed, improve the adhesive
?
temperature resistance and water resistance.
?
According to different adhesive, add 2% to 8% of the total adhesive, it is widely used in all kinds of
?
conveyor belt cold vulcanized adhesive.
?
?
Technical Parameters
?
?
- - - -
Peeling strength (N/25mm) | After adhesive 30 mins≥120 | After adhesive24 hours≥200 |
Shear strength (MPa) | After adhesive 30mins ≥2.5 | After adhesive 24 hours≥4.0 |
Temperature range(℃) | -35—100 |
- - - -
?
?
Advantages
?
CMX3000 adhesive:
?
1. Working temperature: higher than 10°C
?
2. Humidity:less than 90%
?
3. After base adhesive and the hardener mixed, it should be used out within two hours.
?
4. In order to ensure the bonding quality, please test before use it.
?
5. Avoid contact with skin while using it.
?
6. Used combine with ER-45 hardener according to100:4 (1kg:40g)
?
ER-45 hardener:
?
1. Keep out of the sun, Water resistance, damp-proof, Seal, dry conditions in storage.
?
2. Construction site must maintain good ventilation
?
?
- - - -
Num | Name | colour | weight | package |
160801 | LPT3000 adhesive | grey black | 1kg | 10tins/box |
160802 | ER-45 hardener | canary yellow | 40g | 10tins/box |
- - - -
?
?
Usage
?
1. Surface treatment: Polish the conveyor belt or fabric with steel wire wheels uniformly, must not
?
???????????????????????????????????? wounded with fabric;
?
2. Wash: Wash the surface with LPT360 cleaner carefully until without any dirt;
?
3. Drying: Natural drying or heating drying;
?
4. Mixture: Mixing the adhesive and ER-45 hardener by 100:4, and used up within two hours.
?
?????????????????? When you want to use, you can mix for use;
?
5. Coating Adhesive: Coating Adhesive need 3 times. Each coating should be thin and uniform,
?
???????????????????????????????????? when the adhesive dry and not glue the hand, please coating the adhesive again.
?
6. Splice: After the last glue dry and not glue the hand, but good adhesive force, splice is ok.
?
???????????????? When you splice, please notice the center line of the conveyor belt, two bonding surface
?
???????????????? should be matched one time. After splice, beat it tightly from middle to around.
?
7. Seal process: Use CMX918 for processing of the joint. Polish and Brush Seams with the rubber
?
??????????????????????????? adhesive and natural drying. After mixing the rubber adhesive and hardener, use it in
?
??????????????????????????? the joint seams quickly and let it smooth.
?
FAQ
?
01) Q: Normal delivery time?
A: About 15 working days. If we have the store, the time will be shorter.
02) Q: Whether can visit your workshop to see how to process the machine?
A: No problems, you are always welcomed to visit us.
03) Can I be your agent in our area?
A: Yes. ComiX is looking for the agents all over the world. If you are interested , please feel free to contact
?
???? us to?negotiate the agency mattes in details.
?
04) Q: How to get more informaition?
?
A: Please visit www.comixvulcanizer.com or www.comixvulcanizing.com
?
Read More
Wuxi ComiX Vulcanization Technology Co.,Ltd.
Conveyor Belt Vulcanizing Equipment,Conveyor Belt Vulcanizing Press,Conveyor Belt Vulcanizer
Address: NO99. of Furong road, Xishan Economic Development Zone,
Wuxi, Jiangsu
China, 214000
Tel: 86-510-83809086
Fax: 86-510-83783186